Skip to content

Be Prepared for Lane Changes on LBJ

Traffic Configuration after Reduction of Lanes

Eastbound & Westbound LBJ will be reduced from 4 lanes to 3 lanes over the Dallas North Tollway (DNT) between Montfort and Welch beginning this Friday and the LBJ-DNT exit ramps traffic will be shifted to new temporary ramps. The reduction in lanes are necessary in order to begin construction of the LBJ Express over the DNT  (scheduled to begin Labor Day weekend). The duration of this closure is scheduled to last through 2013.

Eastbound LBJ will be reduced to 3 lanes beginning  6:00 a.m.Friday morning.  Prep work for this reduction is listed below:

8:00 p.m. Thursday, August 23rd to 6:00 a.m. Friday, August 24th:

  • Various lanes closed on EB LBJ from Midway Road to Montfort overnight.
  • Ramp closures include:
    • Midway entrance ramp to Eastbound LBJ @ 8pm
    • Eastbound LBJ to Inwood Road/Dallas Pkwy @ 8pm
    • Southbound DNT to Eastbound LBJ@ 10pm
    • Eastbound LBJ to Northbound DNT @ 10pm
    • Eastbound LBJ to Southbound DNT @ 10pm

Westbound LBJ will be reduced to 3 lanes beginning 10:00 a.m. Saturday morning.  Prep work for this reduction is listed below:

9:00 p.m. Friday, August 24th to 10:00 a.m. Saturday, August 25th:

  • Various lanes closed on WB LBJ from Preston Drive to Welch Road overnight.
  • Ramp closures include:
    • Preston entrance ramp to Westbound  I-635 @9pm
    • Westbound LBJ to Inwood Road/Dallas Pkwy @ 9pm
    • Westbound LBJ to Northbound DNT @ 11pm
    • Westbound LBJ to Southbound DNT @ 11pm
    • Northbound DNT to Westbound LBJ @ 11pm

Note:  Weather permitting

We will be posting up the Labor Day weekend closures and work associated with the DNT soon so that you can “know before you go”.

3 Comments Post a comment
  1. I have decided not to even try driving on LBJ for a couple years.

    August 21, 2012
  2. I thought one of the requirements was they had to keep 4 lanes open the whole time. This is complete crap! You are choking N Dallas to death.

    August 28, 2012
  3. By having 4 lanes along 635, the loop ramps merging into IH 635 from the DNT will not have any weaving area which is doesn’t comply with AASHTO (American Association of State Highway and Transportation Officials). If we did not reduce the lanes, we would have been creating a STOP condition which would back traffic along the loop onto the DNT creating a very unsafe situation.

    August 28, 2012

Leave a Reply

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Connecting to %s

Follow

Get every new post delivered to your Inbox.

Join 2,972 other followers

%d bloggers like this: