Skip to content

MAJOR WORK COMING UP ALONG LBJ: COMPLETE CLOSURES ON THE DALLAS NORTH TOLLWAY

635 and Dallas North Tollway Interchange

Dallas, Texas – The LBJ Express team will be setting beams along I-635 (LBJ) and the Dallas North Tollway (DNT) at the end of March and beginning of April.

This work will require full closures of the DNT over LBJ.  All traffic will be diverted to the frontage and over the Inwood Box to access the northbound and southbound lanes of the DNT.

Listed below are the scheduled lane closures associated with this work:

On Wednesday, March 27 from 10 p.m. to Thursday, March 28 at 5 a.m.

  • Full closure of the northbound DNT from Forest Lane to the Galleria Drive.
  • Exit ramp from northbound DNT to eastbound IH 635 will be closed.
  • Northeast and southeast DNT loops will be closed.

    DNT Northbound Closure for LBJ Express Beam Settings

    DNT Northbound Closure for LBJ Express Beam Settings  (March 27th at 10pm till March 28th at 5am)

On Thursday, March 28 from 10 p.m. to Friday, March 29 at 5 a.m.

  • Full closure of the southbound DNT from Keller Springs to Harvest Hill.
  • Closure of the left lane on the southbound frontage road from Belt Line to Harvest Hill.
  • On Ramp from Spring Valley to southbound DNT will be closed.
  • Exit ramp from southbound DNT to westbound 635 will be closed.
  • Northwest and southwest DNT loops will be closed.

 

Southbound DNT Closure for the LBJ Express beam setting.

Southbound Closure for LBJ Express Beam Settings (March 28th at 10pm till March 29th at 5am)

 

On Monday, April 1 from 10 p.m. to Tuesday, April 2 at 5 a.m.

  • Full closure of the northbound DNT from Forest Lane to the Galleria Drive.
  • Exit ramp from northbound DNT to eastbound IH 635 will be closed.
  • Northeast and southeast DNT loops will be closed.
DNT Northbound Closure for LBJ Express Beam Settings

Northbound Closure for LBJ Express Beam Settings (April 1st at 10pm to April 2nd at 5am)

On Tuesday, April 2 from 10 p.m. to Wednesday, April 3 at 5 a.m.

  • Full closure of the southbound DNT from Keller Springs to Harvest Hill.
  • Closure of the left lane on the southbound frontage road from Belt Line to Harvest Hill.
  • On Ramp from Spring Valley to southbound DNT will be closed.
  • Exit ramp from southbound DNT to westbound 635 will be closed.
  • Northwest and southwest DNT loops will be closed.
Southbound DNT Closure for the LBJ Express beam setting.

Southbound DNT Closure for the LBJ Express beam setting.  (April 2nd at 10pm to April 3rd at 5am)

 

Message boards will be placed along the roadway to advise motorists of the closures.  All closures are subject to weather conditions and will be postponed, if necessary.

For more information about upcoming lane closures and traffic-related news along the LBJ Express, go to the “Lane Closures” listing at www.lbjexpress.com.

Sign up for our text message alerts now by texting @lbjexpress to 23559!

No comments yet

Leave a Reply

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

Follow

Get every new post delivered to your Inbox.

Join 3,432 other followers

%d bloggers like this: